Ontario Electrical Safety Code (OESC) Compliant

Heavy-Up Electrical Service & Meter Base Upgrade

Overhead mast and underground lateral infrastructure upgrades coordinated with GTA utility distributors

Duration

8 to 12 hours (may span 2 days for civil trenching)

Outage Window

6 to 8 hours during utility isolation

Permit & Inspection

ESA Certificate of Acceptance

Cost Guidance (GTA Baseline)
$3,600 - $7,500CAD

Includes Licensed Electrical Contractor labour, materials, ESA permit, and local utility coordination.

Request Written Estimate

Service Overview & Technical Context

A true capacity upgrade often extends beyond the interior breaker panel to the external service entrance infrastructure. If your property currently receives electricity via a 100A-rated overhead mast or an undersized underground lateral cable, upgrading to 200A or 400A requires a "heavy-up." This involves installing a new 200A-rated exterior meter base, new heavy-gauge service entrance conductors (2/0 copper or 4/0 aluminum), a taller heavy-duty overhead mast with guy-wire bracing or new underground trenching, and formal service demarcation sign-off with your local electric utility (such as Toronto Hydro, Alectra Utilities, Elexicon Energy, or Hydro One).

Applicable Property Types

  • Older GTA homes with low overhead clearance over driveways
  • Properties where the existing meter base is rated for only 100A or 125A
  • Luxury infill new builds requiring 400-amp high-capacity services
  • Properties transitioning from overhead to underground utility feeds

Standard Amperage Scope

  • 200A Overhead Service
  • 200A Underground Service
  • 400A (320A Continuous) Split Service

Signs & Triggers for This Upgrade

1

Local electric utility notifies homeowner that service mast does not meet height clearance standards

2

Meter base shows rust, water penetration, or is an obsolete 100-amp round enclosure

3

Interior panel upgrade to 200A is blocked because the external service cables are undersized

4

Overhead wires sag dangerously across the street, sidewalk, or neighboring property

5

Building an addition or detached auxiliary garden suite requiring dual metering

Homeowner Benefits & Protections

Full compliance with utility service entrance layout requirements and clearance standards
Robust weather-resistant exterior meter base rated for modern digital smart meters
Reinforced roof penetration and heavy-duty mast assembly resistant to ice storm damage
Unlocks the full 200-amp or 400-amp capacity for the entire residential property

Ontario Electrical Safety Code (OESC) Standards

Component / MetricSpecificationOESC Reference
Meter Socket200A rated, 4-jaw, ringless or ring-type complying with local LDC meter specificationOESC Section 6 / LDC Specification Book
Mast ConduitRigid galvanized steel conduit (minimum 2-inch or 2.5-inch diameter)OESC Rule 6-112
Ground ClearanceMinimum clearance over driveways and pedestrian areas per OESC and LDC rulesOESC Rule 6-112 & Table 33

Execution Workflow: How It Works

1

Utility Service Layout Application

Submission of electrical service layout request to the local utility (Alectra, Toronto Hydro, etc.) for point of attachment approval.

Est. 2 to 4 weeks utility processing
2

ESA Notification & Staging

Filing ESA permit and staging 2-inch rigid steel conduit, meter base, conductors, and weatherhead materials.

Est. 1 day prior
3

Utility Service Disconnect

Utility line crew drops overhead service wires or opens transformer disconnect.

Est. Morning appointment window
4

Mast & Meter Base Construction

Dismantling old mast, installing new heavy-gauge rigid mast with roof boot flashing, securing new meter base, and pulling conductors.

Est. 4 to 6 hours
5

ESA Service Connection Authorization

ESA Inspector inspects point of attachment, meter base ground, and sends electronic Connection Authorization to utility.

Est. Same-day inspection window
6

Utility Line Reconnection

Utility crew re-hangs overhead service drops, crimps tension connectors, re-installs smart meter, and energizes the home.

Est. 1 to 2 hours

Frequently Asked Questions About This Service

Other Panel & Service Solutions

Direct Intake

Request an Assessment for Heavy-Up Electrical Service & Meter Base Upgrade

Connect with Licensed Electrical Contractors across the Greater Toronto Area.

GTA Electrical Capacity & Panel Assessment

Request Your 200A Panel & Service Quotation

Compliant with Ontario Electrical Safety Code (OESC) & Local Utility Requirements.

Step 1 of 4System Specs

1. Property & Electrical Service Profile

Select your current residential configuration to determine electrical service feeder sizes.

Mention if you have an insurance letter regarding obsolete Stab-Lok or screw-in fuses.

Greater Toronto Area Service Office & Business Profile